Monday, January 07, 2008

More Problems at the LDA

This time it's the building:

Peter Hulme Cross: Please can the Mayor update me on progress with the faulty wind turbines removed from the LDA head office roof?

Ken Livingstone: The wind turbines were removed due to a product recall. The LDA is pursuing the installation of replacement wind turbines following the re-engineering of the software that controls the wind turbines as soon as possible.

No comments: